References
-
Installation of a wood chip boiler 1,0 MW, incl. feeding system, BD-Mööbel
Installation of a wood chip boiler 1,0 MW, incl. feeding system, OÜ Alfrina
Construction work of a heating system of a new industrial building, AS Palmako
Installation of a steam boiler 1,5 h/t. Construction work of a heating system of an industrial building, AS Strooker-I
Construction of a five wood driers, OÜ Trives
Installation of a wood chip boiler 0,6 MW, incl. feeding system, AS Finak
Installation of a wood chip boiler 1,0 MW, incl. feeding system, OÜ Carmex Invest
Construction of a piping system located in Tähe 125-127, Tartu.
Construction of a piping system located in Uus st. Tartu.
- Customer:
-
Back