WetorexWetroex<

References

  • Referents
  • Installation of a wood chip boiler 1,0 MW, incl. feeding system, BD-Mööbel

    Installation of a wood chip boiler 1,0 MW, incl. feeding system, OÜ Alfrina

    Construction work of a heating system of a new industrial building, AS Palmako

    Installation of a steam boiler 1,5 h/t. Construction work of a heating system of an industrial building, AS Strooker-I

    Construction of a five wood driers, OÜ Trives

    Installation of a wood chip boiler 0,6 MW, incl. feeding system, AS Finak

    Installation of a wood chip boiler 1,0 MW, incl. feeding system, OÜ Carmex Invest

    Construction of a piping system located in Tähe 125-127, Tartu.

    Construction of a piping system located in  Uus st. Tartu.
  • Customer:
  • Back