References
-
Construction work of a heating system of an industrial buildings, AS Colordia
Installation of a wood chip boiler 1,0 MW, incl. a feeding system, OÜ Sallendor
Installation of a bio fuel boiler 0,6 MW with required systems, OÜ Sanlain Grupp
Installation of a sawdust boiler 2x0,6MW. Construction work of a heating system of an industrial building, NFS OÜ
Installation of a bio fuel boiler 0,6 MW with required systems, Äksi Puhkemaja OÜ
Installation of a bio fuel boiler 0,6 MW. Construction of a wood driers, Atorat OÜ
Installation of a wood chip boiler 2,0 MW, incl. a feeding system, AS Barrus
Installation of a wood chip boiler 1,0 MW, incl. a feeding system, AS Alle
Reconstruction of a bio fuel boiler house, Fortum Termest AS
Construction of a piping system located in Tartu Ranna tee
Reconstruction of a steam boiler DKVR 10-13, Eraküte AS
- Customer:
-
Back